Installation Specifications; Lifting The Outboard - Mercury 150 Operation, Maintenance And Installation Manual

Table of Contents

Advertisement

OUTBOARD INSTALLATION

Installation Specifications

a
a -
Minimum transom opening
b -
Engine centerline for dual engine ‑ 66.0 cm (26 in.)
Minimum Transom Opening
Single engine
Dual engine

Lifting the Outboard

Improperly supporting an engine during lifting can result in the engine falling,
causing serious injury or death. Before lifting the engine, verify that the lifting
ring is threaded into the flywheel for a minimum of five turns and that the
hoist has the correct lifting capacity for the engine weight.
To lift the outboard:
1. Remove the cowl from the outboard.
2. Thread the lifting eye into the flywheel hub for a minimum of five turns.
eng
WARNING
!
a
77
a
b
84.8 cm (33‑3/8 in.)
151.8 cm (59‑3/4 in.)
a -
Lifting eye
28495
18552

Advertisement

Table of Contents
loading

This manual is also suitable for:

175 pro xs optimax

Table of Contents