Mounting Multiple Nodes - Cisco ONS 15454 DWDM Reference Manual

Hide thumbs Also See for ONS 15454 DWDM:
Table of Contents

Advertisement

Chapter 1
Shelf Assembly Hardware

1.3.2 Mounting Multiple Nodes

Figure 1-4
Mounting an ONS 15454 ETSI Shelf in a Rack
Equipment rack
F A N
F A IL
C R
IT
M A
J
M IN
Two people should install the shelf assembly; however, one person can install it using the temporary set
screws included. The shelf assembly should be empty for easier lifting. The front door can also be
removed to lighten the shelf assembly.
1.3.2 Mounting Multiple Nodes
Most standard (Telcordia GR-63-CORE, 23-inch [584.2 mm]) seven-foot (2,133 mm) racks can hold
three ONS 15454 ETSI shelves, two air ramps, and a fuse and alarm panel.
Figure 1-5
shows a
three-shelf ONS 15454 ETSI bay assembly.
Cisco ONS 15454 DWDM Reference Manual, R8.5
1-8
78-18343-02

Advertisement

Table of Contents
loading

Table of Contents