Rack Clearance Requirements; Figure 6: Chassis Clearance Requirements - Alcatel 7750 SR-12 Installation Manual

Table of Contents

Advertisement

R
C
ACK
LEARANCE
Allow at least 20-inches in the front and rear of the rack for maintenance access and to allow
space to remove and install SF/CPM, IOMs, MDAs, and air filter in the front and allow space
to remove and install the cooling trays and DC PEMs in the rear.
7750 SR-12
R
EQUIREMENTS
20" REAR
REQUIRED FOR MAINTENANCE
20" FRONT
REQUIRED FOR MAINTENANCE

Figure 6: Chassis Clearance Requirements

REAR
FRONT
Site Preparation
Page 41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents