Part 8 Trial Operation And Field Settings - Daikin K-Series Service Manual

Floor standing
Table of Contents

Advertisement

SiBE061121.book Page 129 Friday, April 22, 2011 4:12 PM
SiBE061121
1. Pump Down Operation........................................................................130
2. Forced Cooling Operation ...................................................................131
3. Trial Operation ....................................................................................133
4. Field Settings ......................................................................................134
Trial Operation and Field Settings
Trial Operation and
4.1 When 2 Units are Installed in 1 Room..................................................134
4.2 Standby Electricity Saving....................................................................135
4.3 Jumper and Switch Settings.................................................................135
a Diode Bridge ....................................................................................136
Field Settings
Part 8
129

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents