5. For Installation of Left Hand Units Only – Remove
strain relief in right side of CRV. Unclip the right
side wire tie holding the wire harness. Reroute
wires to left side of CRV. Reinstall wire tie in left
side hole. Route wires through left side and
reinstall strain relief. (See Figure 3.)
REROUTING WIRES FOR LEFT HAND UNIT INSTALLATION
Manual 2100-448E
Page
6 of 13
6. Install ventilator by inserting the ventilator into the
unit to the far left side clearing the right filter
bracket. Once the ventilator is fully inserted, slide
the ventilator to the right until it is tight against the
back of the control panel. (See Figure 4.)