Bard CRVS-3 Installation Instructions Manual page 8

Commercial room ventilators with exhaust
Table of Contents

Advertisement

9. Connect leads with fork terminal to corresponding
points on unit terminal strip. (See Manual 2100-
507 for air conditioner connection diagrams; see
Manual 2100-516 for heat pump connection
diagrams.)
10. Close control panel cover.
11. Replace left filter support, filter and four (4) screws
in condenser grille.
12. Reinstall the blower access panel at top of unit and
secure with sheet metal screws.
13. Ventilator Checkout
A. Remove mist eliminator to allow access to
minimum position thumbwheel or blade stops.
B. Resupply power to unit.
C. Energize the evaporator blower by switching
thermostat to the manual fan position with
heat/cool in OFF position.
Manual 2100-448E
Page
8 of 13
D. Ventilator should open to the position set by
position adjustment thumbwheel on the CRVS,
or to the blade stops on the CRVP. On the
CRVS, cycle position adjustment thumbwheel
to full open through full close. Observe damper
blade operation throughout travel to assure free,
unobstructed movement. (See Figure 5.)
E. De-energize evaporator blower. Damper blade
should close.
G. This completes ventilator checkout.
14. Adjust damper blade for required ventilation
airflow. (See next section.)
15. Replace mist eliminator. Be sure it is installed with
the drain holes to the bottom.
16. Remove blank off plate or barometric fresh air
damper installed on service access door. Plug four
(4) mounting holes with the plastic plugs provided
with the ventilator.
17. Replace service access panel.
18. Ventilator is now ready for operation.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Crvp-3Crvp-3l

Table of Contents