Power/Sleep Switch - NEC NovaScale R480 E1 User Manual

Table of Contents

Advertisement

POWER/SLEEP Switch

Use the POWER/SLEEP switch to turn on/off the server.
Power On
Press the POWER/SLEEP switch on the front of the computer chassis.
The POWER/SLEEP LED lights in green.
IMPORTANT:
If the power cord is connected to a power control device such as a UPS (Uninterruptive
Power Supply), make sure that the power control device is powered.
If the power cord is connected to the server, an initial diagnosis of the hardware starts.
The POWER/SLEEP switch does not work during this diagnosis. Wait for about 30
seconds, and press the POWER/SLEEP switch.
Do not power off the server until the characters following the full-screen logo appear on
the screen. Depending on your configuration, it may take three to five minutes.
Sleep
The POWER/SLEEP switch allows you to save almost all power of the server (power-saving mode or sleep mode).
NOTE:
To use the SLEEP switch, an OS supporting the sleep feature is required.
(Available in Windows Server 2003)
Provide the settings for power saving on the operating system, then press the POWER/SLEEP switch on the front of the
server to place the server in the power-saving mode. (The POWER/SLEEP LED blinks.) In the power-saving mode, the
server retains the memory data and the status of the previous operations.
To resume the original state, press the POWER/SLEEP switch. (It may take a little time to resume the original state.)
NOTE:
The operational level in the power-saving mode depends on the OS in use.
(Available in Windows Server 2003.)
IMPORTANT:
you might fail to resume the original state.
POWER/SLEEP switch
Do not change the system configuration while in a power-saving mode,
POWER/SLEEP LED
POWER/SLEEP LED
POWER/SLEEP switch
2-22

Advertisement

Table of Contents
loading

Table of Contents