Overhead Installation - Varytec LED Typhoon PAR Outoor Manual

12x10w rgbwa uv 6in1 ip65
Table of Contents

Advertisement

2.1.1. Overhead installation

Overhead installation
Danger of life!
Danger of life!
You have to observe the regulations of BGV C1 (formerly VBG 70) and
You have to observe the regulations of BGV C1 (formerly VBG 70) and
You have to observe the regulations of BGV C1 (formerly VBG 70) and
EN60598-2-17
The suspension devices have to be build and measured so they can withstand for an hour the tenfold
suspension devices have to be build and measured so they can withstand for an hour the tenfold
suspension devices have to be build and measured so they can withstand for an hour the tenfold
of the payload without suffering a permanent detrimental deformation.
of the payload without suffering a permanent detrimental deformation.
Basically installation has to be made by using a second separate suspension. This can be e
Basically installation has to be made by using a second separate suspension. This can be e
Basically installation has to be made by using a second separate suspension. This can be e.g. a
suitable net. The second suspension must be designed and attached so no part of the installation can
suitable net. The second suspension must be designed and attached so no part of the installation can
suitable net. The second suspension must be designed and attached so no part of the installation can
fall down in case of failure.
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
During construction, reconstruction and deconstruction unnecessary stay in the range of moving
areas, on lightning bridges, under elevated work stations or any other danger zones is forbidden.
dges, under elevated work stations or any other danger zones is forbidden.
dges, under elevated work stations or any other danger zones is forbidden.
The operator is obliged to following safety
The operator is obliged to following safety-related and mechanical facilities:
-
Before the first start-up or after critical changes before restarting it has to be checked by an
expert.
-
Review in the frame of the inspection test at least all four years by an expert. .
Review in the frame of the inspection test at least all four years by an expert. .
Review in the frame of the inspection test at least all four years by an expert. .
-
Review by a qualified person at least once a year.
Review by a qualified person at least once a year.
How to carry out the overhead installation:
How to carry out the overhead installation:
In tidal fall you should install the device out of the lounge area
In tidal fall you should install the device out of the lounge area of people
IMPORTANT! Overhead installation requires a high level of experience. This includes knowledge of
Overhead installation requires a high level of experience. This includes knowledge of
Overhead installation requires a high level of experience. This includes knowledge of
calculating the payload, used installation material and safety inspections of the used material and the
calculating the payload, used installation material and safety inspections of the used material and the
calculating the payload, used installation material and safety inspections of the used material and the
projector whereas the required experience is not limited to this. Do not try to carry out installation
projector whereas the required experience is
yourself under any circumstances if you are not qualified. Contact a professional installer. An
yourself under any circumstances if you are not qualified. Contact a professional installer. An
yourself under any circumstances if you are not qualified. Contact a professional installer. An
inappropriate installation can lead to injuries and/or damaged properties.
inappropriate installation can lead to injuries and/or damaged properties.
It is not allowed to install the device in the grip area of people.
tall the device in the grip area of people.
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory.
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory.
If the device may hang from the ceiling or from high beams, the use of truss systems is mandatory.
The device may not be installed so it can swing freely in the room.
The device may not be installed so it can swing freely in the room.
Please note: Crashing down items can cause
Please note: Crashing down items can cause serious injuries! Do not install the projector, if you doubt
the safety of a possible installation form!
the safety of a possible installation form!
17 Installations are to carry out by skilled personnel only.
Installations are to carry out by skilled personnel only.
up or after critical changes before restarting it has to be checked by an
up or after critical changes before restarting it has to be checked by an
not limited to this. Do not try to carry out installation
serious injuries! Do not install the projector, if you doubt
5 / 20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ip65

Table of Contents