11
SERVICE WORK ON THE CHASSIS
11.10
Installing the lower triple clamp
Main work
–
Clean the bearing and sealing elements, check for damage, and grease.
High viscosity grease (
–
Insert the lower triple clamp with the steering stem. Mount the upper steering
head bearing.
–
Slide on O-ring
–
Position protective ring
C00250-10
–
Position the upper triple clamp with the handlebar.
–
Mount nut
E00208-10
–
Position the fork legs.
Bleeder screws
Info
The second milled groove (from the top) must be flush with the top edge of
the upper triple clamp.
E00209-10
–
Tighten screws
Guideline
Screw, bottom triple clamp
E00210-10
p. 90)
.
.
, but do not tighten it yet.
are positioned toward the front.
.
M8
15 Nm (11.1 lbf ft)
36