Lever (Loading-L/R) - Sony TAV-L1 Service Manual

Integrated home theatre system
Table of Contents

Advertisement

TAV-L1

3-19. LEVER (LOADING-L/R)

1
1
SPT-T (loading-R)
SPR-T (loading-L)
chassis (top)
5 lever (loading-R)
2 two hooks
4 two hooks
3 lever (loading-L)
PRECAUTION DURING LEVER (LOADING R / L) INSTALLATION
BOTTOM VIEW
Align the horizontal position.
lever (loading-L)
lever (loading-R)
Install the both levers so that they move symmetrically.
34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents