Smart Storage Battery - HP proliant ML110 gen9 Maintenance And Service Manual

Hide thumbs Also See for proliant ML110 gen9:
Table of Contents

Advertisement

Remove the cache module.
10.
To replace the component, reverse the removal procedure.

Smart Storage Battery

WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION: To prevent damage to electrical components, take the appropriate anti-static
precautions before beginning any installation, removal, or replacement procedure. Improper
grounding can cause electrostatic discharge.
To remove the component:
Power down the server (on page 24).
1.
Remove all power:
2.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Place the server on its side.
3.
Remove the access panel (on page 24).
4.
If installed, remove the PCI air baffle (on page 25).
5.
Remove the system air baffle (on page 26).
6.
Removal and replacement procedures 43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents