Siemens MAGNETOM Skyra Owner's Manual page 121

Mr system
Hide thumbs Also See for MAGNETOM Skyra:
Table of Contents

Advertisement

Operator Responsibilities for Maintenance
Object or function
Tim dockable table
RF connectors
Comfort kit (option)
Software
1. According to manufacturer recommendations
2. According to manufacturer recommendations
3. Zero helium boil off rate for typical clinical use, depending on sequence and operating time with running helium compressor.
The system needs to be serviced at regular intervals. Undisturbed magnet cooling for 24 hours and 7 days a week.
4. If the system is not connected to Siemens Remote Service (SRS) the replacement has to be performed according to manu-
facturer recommendations. The replacement is performed "on demand" when the system is connected to Siemens Remote
Service (SRS).
© Siemens, 2009
Reason
Preventive measure to
avoid wear and tear
Preventive measure to
avoid wear and tear
Preventive measure to
avoid overheating
Preventive measure
against data loss in the
case of hard disk failure
M7-000.664.01.04.02
03.12
What is checked:
Check the docking mechanism
Check the hydraulic system
Check/refill hydraulic oil
Check/clean connectors of the docking
station
Lubricate RF connectors
Check/clean connectors
Lubricate RF connectors
Replace air filter
Save dynamic data
Clean up directories
Page 13 of 14
CS SD MR
13
Interval
Annually
Annually
Every
2 years
Every
3 months
MAGNETOM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents