Table Of Contents - Buderus Logamax plus GB142-24 Installation Instructions Manual

Condensing
Hide thumbs Also See for Logamax plus GB142-24:
Table of Contents

Advertisement

About these instructions
About these instructions
These Installation Instructions contain important information for the
safe and professional installation, start-up and maintenance of the boiler
with boiler capacities 24, 30, 45 and 60 kW.
These Installation Instructions are intended for professional installers,
who have the necessary training and experience for working on heating
and gas systems.
Subject to technical changes
Slight changes may be made to the illustrations, process steps and
technical data as a result of our policy of continuous improvement.
Updating of documentation
Please contact us if you have any suggestions for improvements or
corrections.

Table of contents

1
Safety and general instructions . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.1
Designated use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2
Hazard definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.3
1.4
1.5
1.6
Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2
Regulations and guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3
Product description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4
Dimensions and connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
5
Packaging and transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
5.1
Scope of delivery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
6
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
6.1
Requirements for the installation room . . . . . . . . . . . . . . 9
6.2
Fitting the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
6.3
Making the gas connection . . . . . . . . . . . . . . . . . . . . . . 10
6.4
6.5
6.6
scope of delivery) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
6.7
6.8
Conversion to Propane . . . . . . . . . . . . . . . . . . . . . . . . . 18
7
Electrical connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
7.1
External connection board connections . . . . . . . . . . . 18
8
Start-up procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
8.1
Testing for gas leaks . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
8.2
Filling the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
8.3
Filling the condensate trap . . . . . . . . . . . . . . . . . . . . . . 22
8.4
Bleeding the gas supply valve . . . . . . . . . . . . . . . . . . . . 22
8.5
8.6
Checking the orifices . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
8.7
Inlet gas pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
8.8
8.9
8.10
8.11
Function testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
2
8.12
Measuring the ionization current . . . . . . . . . . . . . . . . . . 24
8.13
8.14
Installing the casing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
8.15
documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
9
BC10 basic controller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
9.1
Operating the BC10 basic controller . . . . . . . . . . . . . . . 25
9.2
Carrying out additional tasks . . . . . . . . . . . . . . . . . . . . . 27
9.2.1 Carrying out a flue gas test . . . . . . . . . . . . . . . . . . . . . . . 27
gas testing) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
9.3
Configuring the boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
9.3.1 Adjusting the heating capacity . . . . . . . . . . . . . . . . . . . . 27
9.3.2 Setting the DHW temperature value . . . . . . . . . . . . . . . 28
9.3.4 Setting the pump post-purge period . . . . . . . . . . . . . . . 28
10 Shutting down the system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
10.1
10.2
an emergency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
11 Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
11.1
Preparing the boiler for inspection . . . . . . . . . . . . . . . . 29
11.2
11.3
Internal leak testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
11.4
Measuring the ionization current . . . . . . . . . . . . . . . . . . 29
11.5
Measuring the inlet gas pressure . . . . . . . . . . . . . . . . . . 29
11.6
Checking and adjusting the gas/air ratio . . . . . . . . . . . . 29
11.7
11.8
11.9
air intake and flue gas conduit . . . . . . . . . . . . . . . . . . . . 29
11.11 Checking venting systems . . . . . . . . . . . . . . . . . . . . . . . 29
12 Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
12.1
condensate trap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
12.2
Checking and adjusting the gas/air-ratio . . . . . . . . . . . . 31
13 Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
13.1
Operating messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
13.2
Error messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
13.3
Technical specifications . . . . . . . . . . . . . . . . . . . . . . . . . 33
14 Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
14.1
Start-up report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
14.2
Inspection report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
14.3
Maintenance report . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
15 Spare parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Logamax plus GB142-24/30/45/60 - 6720820104 (2017/05)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents