Table of Contents

Advertisement

General
Installation must be carried out in accordance with these instructions, and must be
conducted by designated, qualified and competent personnel.
1.
Before commencing, ensure that the installation conditions comply with the
information given in SPECIFICATION.
2.
Care must be taken during installation to prevent any risk of injury or damage.
3.
The mixing valve should be positioned for easy access during use and
maintenance. All routine maintenance procedures can be conducted with the
mixing valve body in place.
4.
Conveniently situated isolating valves must be provided for maintenance.
5.
Pipework must be rigidly supported.
6.
Pipework dead-legs should be kept to a minimum.
7.
Supply pipework layout should be arranged to minimise the effect of other outlet
usage upon the dynamic pressures at the mixing valve inlets.
8.
To eliminate pipe debris it is essential that supply pipes are thoroughly
flushed through before connection to the mixing valve.

INSTALLATION

15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents