Goodman ACS series Service Instructions Manual page 44

80%, 90%, 95%
Table of Contents

Advertisement

PRODUCT DESIGN
T
HE RUBBER ELBOW IS NOT DESIGNED TO SUPPORAT A LOAD.
RUBBER ELBOW IS MOUNTED EXTERNALLY TO THE FURNACE CABINET,
EXTREME CARE MUST BE TAKEN TO ADEQUATELY SUPPORT FIELD-SUPPLIED
VENT/FLUE PIPING, AS DAMAGE CAN RESULT IN LEAKS CAUSING BODILY
INJURY OR DEATH DUE TO EXPOSURE TO FLUE GASES, INCLUDING CARBON
MONOXIDE.
For upright installations, externally mount the rubber el-
bow to the vent/flue coupling using a worm gear hose clamp.
Secure field supplied vent/flue piping to the rubber elbow
using a worm gear hose clamp. NOTE: Use of the alternate
vent/flue location for upright installations, requires the drain
trap be installed on the same side of the unit as the flue
pipe.
For horizontal installations, externally secure the field-sup-
plied vent/flue pipe directly to the vent/flue coupling using a
PVC or ABS coupling or elbow.
3
1
REMOVE
REMOVE
PIPE
4 SCREWS
*
*
*
5
M
1
P
3
F
F
O
*
C
2
O N
*
*
*
REMOVE
AND RELOCATE
2
DETACH RUBBER
ELBOW FROM
ID BLOWER AND
VENT/FLUE
PIPE
UPFLOW
COUNTERFLOW/UPRIGHT
(UPFLOW SIMILAR)
6
SECURE TO
ID BLOWER WITH
RUBBER COUPLING
AND HOSE
CLAMPS
UPFLOW/HORIZONTAL
(COUNTERFLOW SIMILAR)
90% Furnace Alternate Vent/Flue Location
44
WARNING
W
1.
3
REMOVE
REMOVE
4 SCREWS
PIPE
REMOVE
3 SCREWS
5
REMOVE
AND RELOCATE
DETATCH RUBBER
ELBOW FROM
2
C
ON
O
F
3
P
F
1
M
ID BLOWER AND
VENT/FLUE
COUNTERFLOW
5
ADDITIONAL PLUG
FROM DRAIN KIT
7
EXTERNALLY
MOUNT
RUBBER ELBOW
6
SECURE TO
ID BLOWER WITH
O N
2
C
O
F
3
P
F
1
M
RUBBER COUPLING
AND HOSE
CLAMPS
6
SECURE TO
CABINET WITH
SCREWS
1
3
2
M
P
C
O
O N
F
F
Alternate Combustion Air Intake Location (90% Fur-
naces Only)
NOTE: Alternate combustion fresh air inlet location on the
HEN THE
right hand panel side of 90% furance models was
discontinued since November 2005).
The alternate combustion air intake location is the large hole
not in line with the induced draft blower outlet. Refer to the
following "Alternate Combustion Air Intake Location" figure
for details.
B
E SURE NOT TO DAMAGE INTERNAL WIRING OR OTHER COMPONENTS WHEN
REINSTALLING COUPLING AND SCREWS.
For non-direct vent installations installed horizontally, a
minimum of one 90° elbow must be installed on the com-
bustion air intake coupling to guard against inadvertent block-
age. No elbow is required on the alternate combustion air
1
intake of upright installations, however, a minimum clear-
ance of 2 inches is required to assure proper air supply.
For direct vent installations, secure field-supplied combus-
tion air intake pipe directly to the air intake coupling.
2
1
REMOVE
4 SCREWS
REMOVE
PIPE
UPFLOW
4
SECURE
TO CABINET
90% Furnace Alternate Combustion
Non-Direct Vent (Single Pipe) Piping (90% Furnaces
Only)
Non-direct vent installations require only a vent/flue pipe.
The vent pipe can be run horizontally with an exit through
the side of the building or run vertically with an exit through
the roof of the building. The vent can also be run through an
existing unused chimney; however, it must extend a mini-
mum of 12 inches above the top of the chimney. The space
CAUTION
2
REMOVE
4 SCREWS
2
REMOVE
AND CUT
1
3
REMOVE
REMOVE
3 SCREWS
AND
3
RELOCATE
ADDITIONAL
PLUG FROM
DRAIN KIT
COUNTERFLOW
5
UPFLOW/HORIZONTAL SHOWN
(COUNTERFLOW SIMILAR)
Air Intake Location
1
5
2" CLEARANCE
REQUIRED
(NON-DIRECT
VENT)
3
.
REMOVE
AND
RELOCATE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents