Scheduled Maintenance - Technogym BIKE XT Service Maintenance Manual

Table of Contents

Advertisement

BIKE XT: Service & Maintenance manual - rev. 2.0

10. SCHEDULED MAINTENANCE

To keep the machine in perfect working order, carry out the scheduled maintenance operations
specified in the table below:
MACHINE
EXTERIOR
MACHINE
INTERIOR
BELT
CHAIN
SADDLE
STEM
These operations must be carried out with the machine turned off and the mains lead
unplugged from the wall output.
The scheduled maintenance operations are described below:
(A) EXTERNAL CLEANING
Carry out every week. For this operation, use only a mild detergent. Be careful never to spray
the product directly onto the machine: use it to moisten a cloth.
(B) INTERNAL CLEANING
Carry out every month. Open the side casings (see paragraph 7.7. ) and use a vacuum cleaner
or compressed air to thoroughly clean the interior, taking special care near the alternator and
the electronic circuit boards.
(C) BELT TENSION CHECK
Carry out every 6 months. Open the side casings (see paragraph 7.7. ) and check the belt
tension. If necessary, adjust the tension as described in paragraph 8.2. .
(D) BELT WEAR CHECK
Carry out once a year. Open the chain (see paragraph 7.7. ) and inspect the belt surface over its
entire length, paying particular attention to the edges and the inner part. If it appears worn out
or frayed, replace the belt (see paragraph 7.10. ).
(E) CHAIN TENSION CHECK
Carry out every 6 months. Open the chain (see paragraph 7.7. ) and check the belt tension as
described in paragraph 8.4. .
CLEANING
TENSION
CHECK
weekly
(A)
monthly
(B)
twice-yearly
(C)
twice-yearly
(E)
WEAR
PLAY
CHECK
CHECK
yearly
(D)
yearly
(F)
twice-yearly
(H)
LUBRI-
CATION
twice-yearly
(G)
Page 10.1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents