Test Point Diagram - Mitsubishi Electric PUHZ-P200YKA.UK Service Manual

Table of Contents

Advertisement

10-9. TEST POINT DIAGRAM

Outdoor controller circuit board
PUHZ-P200YKA.UK
PUHZ-P200YKAR1.UK
SW1
Forced defrost,
SW7
detect history
Demand control setting
record reset,
refrigerant address
SW6
Model select
SW4
Test operation
SWP
Pump down
SW5
Function switch
SW8
Pipe replace
Wiring replace
CNM
Connect to A control
service tool
CNMNT
Connect to
M-NET adapter (CN5)
CNVMNT
Connect to
M-NET adapter (CND)
LEV-A
Linear expansion valve
63H
High pressure switch
TH3
Thermistor
<Liquid>
TH7/6
Thermistor
<Ambient/
2-phase pipe>
TH32
Thermistor
<Comp. Surface>
V
FG
(Voltage between
right pins of PC5C
and PC5D, pin 3
and pin 4)
(Same as
(CNF1
(+)–
(−))
7
4
V
SP
(Voltage between pins of
C5A, C5B):
CNF1, CNF2
0 V DC (when stopped),
Connect to the fan motor
1– 6.5 V DC (when operated)
1–4: 250–330 V DC
5–4: 15 V DC
6–4: 0–6.5 V DC
7–4: 15 V DC (When stopped)
OCH582B
PUHZ-P250YKA.UK
PUHZ-P250YKAR1.UK
CNDM
1–2: Input of low-level sound priority mode
1–3: Input of external contact point
7.5 V DC (When operated)
(0–15 V pulse)
CNDC
250–330 V DC
Communication power supply
(1+, 3−)
D71 Voltage
(Noise filter circuit board)
24 V DC
59
<CAUTION> TEST POINT1 is high voltage.
CN51
External signal output
• Compressor operating signal
• Abnormal signal
CN4
Transmission to out-
door power circuit
board (CN4)
21S4
4-way valve
CN2
Connect to the outdoor
power circuit board (CN2)
1–5: R eception from
2–5: Z ero cross signal
3,4: Not used
6–5: 16 V DC
7–5: 16 V DC
CNAC
2 to 4: Power supply for out-
1 to 3: Power supply for
CNS
S1–S2: 230 V AC
+ −
power circuit board
(0–5 V DC)
door controller circuit
board (230 V AC)
indoor and outdoor
unit connection
wire (230 V AC)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Puhz-p250ykar1.ukPuhz-p250yka.ukPuhz-p200ykar1.uk

Table of Contents