Removal Of Signal Receiver Unit / Swing Motor - Daikin FLKS25BAVMB Service Manual

Inverter pair floor/ceiling suspended dual type ba series
Hide thumbs Also See for FLKS25BAVMB:
Table of Contents

Advertisement

SiENBE05-722_A
1.4

Removal of Signal Receiver Unit / Swing Motor

Procedure
Step
1. Remove the signal
receiver unit.
1
Unfasten the 2 hooks
(right and left sides) to
remove the signal
receiver unit.
2
Remove the wire
harness of the signal
receiver unit from the
groove.
2. Remove the swing motor.
1
Remove the 2 screws
and remove the swing
motor.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Signal receiver unit
Swing motor
Points
(R2995)
Note:
Rearrange the wire harness in
position as it was when
reassembling signal receiver
unit.
(R2998)
Indoor Unit
119

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents