Install The Director In A Rack; Rack-Mount Checklist; Mounting Hardware; Brackets - HP StorageWorks Director 2/140 Installation Manual

Hide thumbs Also See for StorageWorks Director 2/140:
Table of Contents

Advertisement

Installing and Configuring the Director
5. After successful POST completion, the green power LED on the front bezel,
6. If a POST error or other malfunction occurs, refer to the HP StorageWorks

Install the Director in a Rack

This section describes the procedures used for installing a StorageWorks
Director 2/140 in an appropriate HP, or comparable, 19-inch Electronic Industries
Association (EIA) rack:

Rack-Mount Checklist

This chapter describes the contents of the rack-mount kit as well as tools or
equipment required to complete the installation.

Mounting Hardware

Mounting hardware includes:

Brackets

Brackets and rails included in the kit are shown in
1 Two (2) rear mounting brackets
2 Four (4) angle mounting brackets (small)
3 Two (2) shelf brackets
4 Two (2) rear mounting plates
42
c. Green LEDs associated with Fibre Channel ports sequentially illuminate
as the ports are tested.
green LED on the active CTP card, and green PWR OK LEDs on both power
supplies remain illuminated.
Director 2/140 Service Manual to isolate the problem.
HP 9000, HP 10000, and HP 11000 Series racks
HP rack system/e or 19-inch EIA rack
Twenty-six (26) Phillips panhead screws (10-32 x 1/2) with split lock and flat
washers.
Twelve (12) Phillips flathead countersunk screws (10-32 x 3/8).
Twenty (20) cage nuts.
Eight (8) self-tapping sheet metal screws (10-32 x 1/2).
Figure
9:
Director 2/140 Installation Guide