Panasonic cs-pa7dkd Service Manual page 37

Air circulation up to 10.10 m3/min
Table of Contents

Advertisement

9.2.
Outline of installation
Installation works
1. Installation of indoor, outdoor unit
1) Select the best location
2) Indoor unit installation
2. Piping and drainage of indoor unit
1) Prepare of piping
2) Connection of piping
For the right piping
For the left piping
3. In case of Embedded Piping
For the embedded piping
4. Connecting piping and cable to
the outdoor unit
1) Connecting the piping to
the outdoor unit
2) Connecting the cable
5.Checking the drainage and connecting
the cable to inddor unit
1) Checking the drainage
2)Connect the cable to the
indoor unit
6. Test Running
1) Connect the power supply
2) Evaluation of the performance
Installation parts
Installation plate
38
4 wooden screws
39
4 anchor bolts
Pipes: Gas side
Liquid side
40
Insulated drain hose
41
Insulation materials
41
42
Pipes:Gas side
44
Liquid side
Insulated drain hose
Insulation materials
Additional drain hose
(Outer diameter
Connecting cable
45
(3-core wire/1.5mm 2 )
45
Locally approved cable
Connecting cable
(3-core wire/1.5mm 2 )
46
Locally approved cable
47
48
48
37
CS-PA7DKD / CU-PA7DKD / CS-PC7DKD / CU-PC7DKD
Required tools
A level gauge
Philips screw driver
Electric drill hole-core
drill( 70mm)
Side cutter or electrical pliers
3/8''
Flaring tools set
1/4''
Specified torque wrenches
18N.m
42N.m
Spanner
Flaring tools set
3/8 "
Specified torque wrenches
1/4"
18N . m
42N . m
Spanner
Specified torque wrenches
18N . m
1.5mm)
42N . m
A glass of water
Phillips screw driver
Circuit breaker or time delay
fuse(consult an electrician)
Operating instructions
Thermometer
Liquid side piping
Gas side piping
Half union
Liquid side piping
Gas side piping
Half union
Liquid side
Gas side

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents