Nordyne *TC Installation Instructions Manual page 49

Two-stage condensing gas furnaces with fixed & variable speed blowers
Table of Contents

Advertisement

DOWNFLOW
= 1 PiPE OPTIONS
L_
COMBUSTION
AIR
Option
9
[
_3
iLLi
Rubber
Grommet
PVC TEE,
Reducer, &
1/2" x 1/2"
Hose Barb
See VIEW E for drain line positions
m
o_
Rubber
Grommet
i'"i
LU F COMBUSTION
'3
See VIEW F for drain line positions
PVCTEE,
Reducer,&
1/2"x 1/2"
Hose Barb
L
wi
a-i
wi
3_
u-i
Rubber
Grommet
COMBUSTION
AIR
Option,,
See VIEW G for drain line positions
VIEW -E-
Inline Drain
NOTES:
1.) All drain lines must be trapped with J-Trap or field supplied loop.
2.) Drain line traps may be positioned inside or outside the cabinet.
3.) Inline drain tubing may need to be cut to length to resemble illustration.
blower deck and side of cabinet.
tubing is routed thru
the blower deck and
side of cabinet.
DOWNFLOW
= 2 PiPE OPTIONS
i-i
im
O i
Flange
Option
PVCTEE,
Reducer,&
1/2"x 1/2"
HoseBarb
Rubber X
Grommet
n
i,
cai
O i
Flange
£
O_
PVC TEE,
Reducer, &
1/2" x 1/2"
Hose Barb
Rubber
Grommet
;zi
ioi
_l--i
;1::0
_oi
c_ _
Flange
Plug .-_
_/
O0,,on
14
_
E
See VIEW E for drain line positions
See VIEW F for drain line positions
See VIEW G for drain line positions
Figure 40. Downflow Options
49

Advertisement

Table of Contents
loading

This manual is also suitable for:

*tl

Table of Contents