Nordyne *TC Installation Instructions Manual page 47

Two-stage condensing gas furnaces with fixed & variable speed blowers
Table of Contents

Advertisement

Ob
COMBUSTION
AIR
OPTION 1
UPFLOW - 1
i,,,i
o_i
PVC TEE,
_i
Reducer,
&
"Yi
1/2" x 1/2"
Hose Barb
Rubber
Grommet
PIPE OPTIONS
PVC TEE,
Reducer,
&
1/2" x 1/2"
Hose Barb
Rubber
Grommet
COMBUSTION
AIR
OPTION 2
Ob
m
Q_
See VIEW A for drain line positions
VIEW -A-
See VIEW B for drain line positions
VIEW -B-
Drain Line Attached
to
1/2" x 1/2" Hose Barb
Inline
[
I
Drain
Header box drain
tubing is routed thru the blower
deck and side of cabinet.
NOTES:
1.) All drain lines must be trapped with J-Trap or field supplied loop.
2.) Drain line traps may be positioned inside or outside the cabinet.
3.) Inline drain tubing may need to be cut to length to resemble illustration.
I
Header box drain
tubing is routed thru
the blower deck and
side of cabinet.
Inline Drain - Tubing is routed thru the blower deck and side
of cabinet. NOTE: This drain not needed if "X" is less than 6".
OC
<(
03
rn
o
Ob
=
Q_
OPTION 3
See VIEW A for drain line positions
UPFLOW - 2 PIPE OPTIONS
t
PVC TEE,
Reducer, &
1/2" x 1/2"
Hose Barb
PVC TEE,
Reducer,
&
1/2" x 1/2"
Hose Barb
Z_
oi
Di
m_
o_
See VIEW B for drain line positions
Figure 38. Upfiow Options
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

*tl

Table of Contents