Nordyne *TC Installation Instructions Manual page 46

Two-stage condensing gas furnaces with fixed & variable speed blowers
Table of Contents

Advertisement

HORIZONTAL
VENTING
(2-Pipe Shown)
90°
/
Elbow
===
/
L.,
L.,
Straps or Other Suitable
Supports at minimum of 5 ft. Intervals
I
/
\
:i
!i
J
_
¢
_
90° Elbow J'_
See Table 2 for PVC Pipe
:_ O._._=._J_[
Lengths (Field Supplied)
_.
I,U
\
!:
....
i_i
l
Upward Pitch - 1/4" per foot
(Flue Pipe)
First support placed as close
to furnace connection as possible
PVC TEE, Reducer,
and 1/2" x 1/2" Hose Barb
Seal/Caulk
Around Pipes
at Building
_//_/
90 °
_
__,/"
Elbow
il
L ......
_
n.
Wall
j
Normal
Snow Level
VERTICAL
VENTING
(2-Pipe Shown)
B::
:::] _
Support System on
-'i
Vertical Rise -_=,-r-
........
_<i
............
z'
o
See Table 2 for PVC Pipe
Lengths (Field Supplied)
::ra
::o
Couplings with 2
o,
Hose Clamps (Optional)
Support System on [-_
-_
Vertical
Rise
First Support as Close
_- _:_:::]
to Furnace
as Possible
=
= =
/
(both ends)
_
PVC TEE, Reducer,
and 1/2" x 1/2" Hose Barb
See Table 2 for PVC Pipe
Lengths (Field Supplied)
7
F4
i,,,i
E_
_=,
Figure 37. Horizontal and Vertical Venting
46

Advertisement

Table of Contents
loading

This manual is also suitable for:

*tl

Table of Contents