Download Print this page

ParaBody GS2 User Manual page 19

Gym system
Hide thumbs Also See for GS2:

Advertisement

3/8 X 1 -3/4"
3/8 X 3-3/4" 30
3/8 X 3-3/4"
FIGURE 17
STEP 17:
Refer to cable ILLUSTRATION "A" on page 14 for cable routing while installing pulleys.
Assemble one 3-1/2" PULLEY (24) between BASE PLATES (3) using one 3/8 X 3-3/4" BOLT (30), two 3/8 X 1" SPACERS
(43), one 3/8" LOCK NUT (34) and tighten securely.
Loosely assemble one 3-1/2" PULLEY (24) between the PULLEY PLATES (12) using one 3/8 X 1-3/4" BOLT (27), and one
3/8" LOCK NUT (34).
Secure end of LOW CABLE (21) using one 3/8 x 3-3/4" BOLT (30), one 3/8" FLAT WASHER (36) and one 3/8" LOCK NUT (34)
as shown in FIGURE 17
Tighten both 3-1/2" PULLEYS (24) located on PULLEY PLATES (12)
1/2
0
27
30
1/2
1/2
1
2
12
3
1/2
3
4
19
36
34
43
24
1/2
1/2
5
6

Advertisement

loading