Download Print this page

ParaBody GS2 User Manual page 16

Gym system
Hide thumbs Also See for GS2:

Advertisement

3/8 X 3-3/4"
3/8 X 8-3/4"
31
36
44
FIGURE 14
STEP 14:
Refer to cable ILLUSTRATION "A" on page 14 for cable routing while installing pulleys.
Assemble one 3-1/2" PULLEY (24) into the PRIMARY PIVOT (9) lower hole using one 3/8 X 8-3/4" BOLT (31),
two 3/8" FLAT WASHERS (36), two 3/8 X 1-1/2" SPACERS (44) and one 3/8" LOCK NUT (34) and tighten securely.
Assemble one 3-1/2" PULLEY (24) to the FRAME (1) using one 3/8 X 3-3/4" BOLT (30), two 3/8 X 1-1/16"
FLANGE SPACERS (42), one 3/8" LOCK NUT (34) and tighten securely
Loosely assemble one 3-1/2" PULLEY (24) between PULLEY PLATES (12) using one 3/8 X 1-3/4" BOLT (27) and
one 3/8" LOCK NUT (34).
Assemble two 3-1/2" PULLEYS (24) between the left and right BOOM PLATES (4) and (5) using two 3/8 X 3-3/4" BOLTS (30),
two 3/8 X 1" SPACERS (43), two 3-1/2" CABLE GUARDS (38) and two 3/8" LOCK NUTS (34)
1/2
0
30
1
42
9
27
3/8 X 1-3/4"
1/2
1
2
38
12
1/2
1/2
3
4
16
24
43
34
1/2
1/2
5
6

Advertisement

loading