Section 5: General Suspension Details; Figure 16: Critical Hanger Placement - Roberts Gorden Blackheat BH15UT Installation, Operation & Service Manual

Vacuum assisted linear, double linear, u-tube, and multi-burner gas fired heating systems
Table of Contents

Advertisement

®
B
I
LACKHEAT
NSTALLATION

SECTION 5: GENERAL SUSPENSION DETAILS

WARNING
Hang heater with materials
with a minimum working
load of 33 kg (75 lbs).
Failure of the supports can
result in death, injury
or property damage.
To ensure your safety, and comply with the terms of the
warranty, all units must be installed in accordance with
these instructions.

Figure 16: Critical Hanger Placement

Side View
Description
Part Number
Burner Tube
Bow Shackle
E0007576
Tube/Reflector Hanger
8
O
S
M
PERATION AND
ERVICE
Crush Hazard
Typical Suspension Details
I-Beam
10 mm
60 cm
Rod
minimum*
Turnbuckle
(not included)
* Allows for thermal expansion of system.
Bow Shackle
Hanger
100 mm
Max.
03051100
03090100
ANUAL
The gas or the electrical supply lines must not be used to
support the heater.
Do not locate the gas or electric supply lines directly over
the path of the flue products from the heater.
The heater must be installed in a location that it is readily
accessible for servicing.
The heaters must be installed with clearances to
combustibles as indicated on the rating plate and in this
manual.
The minimum and maximum gas inlet pressures must be
maintained as indicated on the rating plate.Typical
installation configurations are shown in Figure 16.
Concrete
Beam
Beam
Clamp
Anchor
I-Beam
30 cm
minimum*
Bow
Shackle
Front View
Screw Hook
min. 10 mm
Washer
Locknut
Washer
Wood
Beam
Hanger
45° Angle

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents