Power Supply Side Wiring Diagrams; D9412Gv4/D7412Gv4 V2.00 (And Higher) Power Supply Side System - Bosch D9412GV4 Installation Manual

Hide thumbs Also See for D9412GV4:
Table of Contents

Advertisement

12
en | Diagrams
3.2

Power Supply Side Wiring Diagrams

3.2.1

D9412GV4/D7412GV4 v2.00 (and higher) Power Supply Side System

(D113, D122/D122L, D192G, D928, D1640, D8132) Wiring Diagram (Power
and Phone)
Figure 3.5: Side System Wiring Diagram
Callout - Description
1 - If required by local AHJ, connect D113
Battery Lead Supervision Module.
2 - Batteries
3 - D122/D122L Dual Battery Harness, as
required
4 - To Supervision Point
5 - D1640 Transformer (NFPA applications may
require the use of a D8004 Transformer
Enclosure
6 - D8132 Dual Battery Charger with two
batteries (Batteries are not supervised.)
7 - D192G Bell Supervision Module
2016.07 | 04 | F.01U.291.483
Callout - Description
8 - To Output A or Output B
9 - Listed Audible Signaling Devices rated at 12.0 VDC nominal
(do not use vibrating type horns)
10 - C900V2 (optional)
11 - Secondary phone line (part of D928)
12 - 560 Ω, 2 W end-of-line (EOL) Resistor (P/N: 15-03130-005)
13 - D928
14 - To earth ground
UL Installation Guide
Bosch Security Systens, Inc.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D7412gv4

Table of Contents