Cabinet Maintenance Schedule - True GDM Series Technical & Service Manual

Hide thumbs Also See for GDM Series:
Table of Contents

Advertisement

CABINET MAINTENANCE SCHEDULE

Monthly, Quarterly, and Yearly
CABINET MAINTENANCE SCHEDULE
MONTHLY
1. Check product temperature.
2. Brush off condenser coil.
3. Inspect lamps and lamp holder connections.
QUARTERLY
1. Check physical condition of condenser coil and evaporator coil (straighten fins if necessary.
2. Blow out condenser coil with compressed air.
3. Brush off evaporator coil if needed.
4. Check physical condition of gaskets and also make sure they are sealing correctly.
YEARLY
1. Check operation of all moving parts (fan motors, doors, defrost timers, & IDL door cords)
2. Check all electrical connections, make sure they are all tight and crimps in good condition.
3. Check defrost timer contacts, make sure they are not pitted.
4. Check rear condenser coil screen (clean if necessary).
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gdt series

Table of Contents