Buderus 500-24C Installation And Maintenance Instructions Manual page 36

Gas wall hung boiler condensing
Hide thumbs Also See for 500-24C:
Table of Contents

Advertisement

2
Commissioning
To drain the boiler take the following steps:
V Close the MCW inlet and the CH return valve.
V Connect drainage hose (
V Close the CH return and CH flow valves.
V Connect draining hose to draining point on the mani-
fold (
fig. 46, item 1).
V Open draining point to drain the boiler (
item 1).
Fill the condensate trap
V Remove the condensate trap and fill with water
(
fig. 47 and fig. 48).
36
fig. 46).
fig. 46,
Buderus 500-24C/28C - Subject to modifications resulting from technical improvements
1
2
Draining the boiler
Fig. 46
1
stop valve
2
CH flow
3
MCW inlet
4
CH return
5
drain
6
drainage hose
Disconnect hose from condensate trap
Fig. 47
Fig. 48 Remove the condensate trap and fill with water
6
1
3
5
Drain
4
7215 3100-46.1TD
7215 3100-47.1TD
7215 3100-48.1TD

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

500-28c

Table of Contents