1
Installation
V Slide the receiver securely into the bracket, supplied
with the boiler (
fig. 35).
V Slide the bracket in the guide rails on the underside of
the boiler (
fig. 36).
V Remove the securing screw (
lower the Boiler Control Unit (DBA) (
28
fig. 32, item 1) and
fig. 32, item 2).
Buderus 500-24C/28C - Subject to modifications resulting from technical improvements
Fig. 35 Place receiver into bracket
Fig. 36 Hang bracket under boiler
7215 3100-35.1TD
7215 3100-36.1TD