Buderus 500-24C Installation And Maintenance Instructions Manual page 28

Gas wall hung boiler condensing
Hide thumbs Also See for 500-24C:
Table of Contents

Advertisement

1
Installation
V Slide the receiver securely into the bracket, supplied
with the boiler (
fig. 35).
V Slide the bracket in the guide rails on the underside of
the boiler (
fig. 36).
V Remove the securing screw (
lower the Boiler Control Unit (DBA) (
28
fig. 32, item 1) and
fig. 32, item 2).
Buderus 500-24C/28C - Subject to modifications resulting from technical improvements
Fig. 35 Place receiver into bracket
Fig. 36 Hang bracket under boiler
7215 3100-35.1TD
7215 3100-36.1TD

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

500-28c

Table of Contents