Daikin CMSQ200A7W1B Service Manual page 86

Hide thumbs Also See for CMSQ200A7W1B:
Table of Contents

Advertisement

SiBE28-805
Note:
Make sure that all outside panels, except for the panel on the electric box, are closed while
working.
Close the lid of the electric box firmly before turning on the power.
Location of the dip switches, LEDs and buttons
Do not change the factory setting of the DIP switches.
LED state
Throughout the manual the state of the LEDs is indicated as follows:
Setting the push button switch (BS1~5)
Function of the push button switch which is located on the outdoor unit PC board (A1P):
BS1 MODE
BS2 SET
BS3 RETURN For field setting
BS4 TEST
BS5 RESET
The figure shows state of the LED indications when the unit is shipped from the factory.
Check operation procedure
1. Turn the power on for the outdoor unit and the indoor unit.
2. Make sure that transmission is normal by checking the LED display on the outdoor unit
Test Operation
Push button switches BS1~BS5
DIP switch 1 (DS1: 1~4)
DIP switch 2 (DS2: 1~4)
DIP switch 3 (DS3: 1~2)
h
OFF
k
ON
l
Blinking
l
TEST:
C/H SELECT
MODE
k
HWL:
IND
MASTER
h
h
k
H1P
H2P
H3P
H4P
BS1
BS2
BS3
MODE
SET
RETURN
For changing the set mode
For field setting
For test operation
For resetting the address when the wiring is changed or when an additional
indoor unit is installed
Be sure to turn the power on at least 6 hours before operation in order to have power
running to the crank case heater.
circuit board (A1P). (If transmission is normal, each LED will be displayed as shown below.)
Micro-
computer
Ready
Mode
operation
/Error
monitor
HAP
H1P
H2P
l
h
LED H1~8P
L.N.O.P DEMAND
SLAVE
h
h
h
h
H5P
H6P
H7P
BS4
BS5
TEST
RESET
Cooling/Heating
changeover
Bulk
Individual
(master)
H3P
H4P
h
k
h
Test Operation
MULTI
h
H8P
Low
Demand
noise
Bulk
(slave)
H5P
H6P
H7P
h
h
h
Multi
H8P
h
75

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fmdq50-125a7v3bCmsq250a7w1bFmcq50-125a7veb

Table of Contents