Test Operation

1. Test Operation
1.1

Installation Process

Below figure shows the installation process. Install in the order of the steps shown.
10. Checking of Device and Installation Conditions
11. Additional Refrigerant Charge and Check Operation
64
3. Selection of Location
4. Inspecting and Handling the Unit
5. Placing the Unit
7. Field Wiring
8. Airtight Test and Vacuum Drying
9. Pipe Insulation
13. Test Run
6. Refrigerant Piping
Operations which require the
power to be turned on.
SiBE28-805
Test Operation