Checking Off A To Do List Item; Changing To Do List Item Details - Palm Zire 21 Handbook

Palmone handheld user guide
Hide thumbs Also See for Zire 21:
Table of Contents

Advertisement

Checking off a To Do List item

You can check off a To Do List item to indicate that you've completed it. You can
set the To Do List to record the date that you complete the To Do item, and you can
choose to show or hide completed items. See
chapter.
To check off a To Do List item:
Tap the check box on the left side of the item.

Changing To Do List item details

The To Do Item Details dialog box enables you to change settings for individual
items.
To display the To Do Item Details dialog box:
Tap the text of the item whose details you want to change.
1.
Tap Details.
2.
"To Do Show Options"
Completed
To Do item
Checking off a To Do List item
later in this
119

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zire

Table of Contents