Setting Priority - Palm Zire 21 Handbook

Palmone handheld user guide
Hide thumbs Also See for Zire 21:
Table of Contents

Advertisement

Chapter 13 Using To Do List
Tap New.
3.
Enter the text of the To Do List item. The text can be longer than one line.
4.
Tap anywhere onscreen to deselect the To Do List item.
5.
If no To Do List item is currently selected, writing in the Graffiti
TIP
automatically creates a new item.

Setting priority

The priority setting for items lets you arrange the tasks in your To Do List
according to their importance or urgency. The default setting for the To Do List is
to arrange items by priority and due date, with priority 1 items at the top. If you
have a number of items in your list, changing an item's priority setting may move
its position in the list.
When you create a new To Do List item, its priority is automatically set to 1, the
highest (most important) level. If you select another item first, however, the item
you create appears beneath the selected item and is given the same priority as the
selected item.
To set the priority of a To Do List item:
Tap the Priority number on the left side of the To Do List item.
1.
Tap the Priority number that you want to set (1 is most important).
2.
118
New To
Do item
Tap New
Tap here
Tap to
select
priority
®
writing area

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zire

Table of Contents