Install Bagger And Discharge Baffles; Bagger Operation - Toro 74191 Operator's Manual

Out front z
Table of Contents

Advertisement

Assembly
Install Bagger and Discharge
Baffles
When changing between bagging and recycling,
baffles must be removed and replaced
1.
Tilt mower into the vertical position, refer to;
Tilting the Mower, page 27.
2.
Remove capscrews ,locknuts, carriage bolts and
Recycler baffles from the mower (Fig. 5).
Note:
Save all hardware for use when
installing Recycler baffles.
3.
Locate the left and right bagger baffles inside the
mower and secure with (6) 5/16–18 x 3/4"
(19 mm) carriage bolts, through from the top of
mower, and (6) 5/16" locknuts (Fig. 7).
4.
Locate the left and right discharge baffles inside
the mower and secure with (4) 5/16–18 x 3/4"
(19 mm) carriage bolts, through from the bottom
and inside of mower, washers, and (4) 5/16"
locknut.(Fig. 7).
2
5
3
1
Figure 7
1. Bagger baffle
2. Retainer Nut
3. Cap Screw
18
3
4. Discharge baffle
5. Washer (.344x.688)
6. Carriage Bolt

Bagger Operation

When operating the mower with bagger baffles
installed you must engage the blower drive belt.
1.
Stop the engine, remove the key and disconnect
the spark plug wire(s) from the spark plug(s).
2.
Place belt around blower, idler and PTO pulleys.
3.
Push up on the spring loaded idler arm, behind
PTO (power take off) gearbox, to relax pressure
on spring (Fig. 6).
4.
Remove hairpin cotter and clevis pin from slot in
frame and allow idler to tension belt (Fig. 6).
5.
Install hairpin cotter and clevis pin in outer hole
of idler arm for storage (Fig. 6).
4
6
4
1. Idler arm
2. Frame slot
2
Figure 8
3. Clevis pin
4. Hairpin cotter
3
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z–320

Table of Contents