Exhaust Lines - Curtis SERA2B Service Manual

Seraphim coffee brewer
Hide thumbs Also See for SERA2B:
Table of Contents

Advertisement

Exhaust Lines

The water tower is equipped with two outlet fittings that
vent steam and condensation from the water tank inside
the chassis. Run the provided exhaust line tubing from
these fittings to a drain to drain off condensation.
IMPORTANT: The exhaust line tubing must be
installed so that ends do not become submerged
in water to avoid backup.
Hold-down Brackets
Install the hold-down brackets after mounting the brew
heads and making the water and electrical hookups on
the water tower.
The hold-down brackets are for positioning the water
tower and to reduce the risk of tipping. The water tower
must be secured to the bottom of the cabinet.
CAUTION: Failure to install the anti-tip brackets
may cause the unit to tip over when installed in
a mobile coffee counter. Injury might result from
spilled hot liquids or damage may occur to the
water tower itself.
The brackets fasten onto the floor and prevent the water
tower from shifting from its predetermined position. If
the brewer is ever installed in a different location, these
brackets must also be moved and installed with the
water tower. The hold-down brackets are affixed to the
bottom edge of the water tower. One on the front and
one on the side.
STEP 6. TURN ON THE BREWER
Once the brew heads and the UCM are correctly mounted on the counter top and the water tower is properly installed, turn on
the water supply at the water source. After turning on the water, plug in the power cord. Connect the unit to an electrical circuit
with an appropriate amperage rating; refer to the serial tag on the machine and local/national electrical codes to determine circuit
requirements. Turn on power to the circuit supplying power to the unit at the circuit breaker panel. Turn the toggle switch on the
back of the water tower to the ON position. The water tank will start to fill. Once filled, the heating elements will come on. It will take
about 45 minutes for the temperature to reach 200ºF. You are now ready to brew.
6
Figure 9 - Exhaust Line Installation
Figure 10 - Hold-Down Bracket
EXHAUST LINES
ATTACHED TO
TANK OVERFLOW
FITTINGS
DO NOT
SUBMERGE END
OF TUBING IN
WATER

Advertisement

Table of Contents
loading

Table of Contents