Download Print this page

Toshiba RAS-B10EKVP-E Service Manual page 87

Split type
Hide thumbs Also See for RAS-B10EKVP-E:

Advertisement

Ilmalämpöpumppujen myynti, huolto ja asennus: Jäähdytinpalvelu RefGroup Oy.
No.
Part name
"
High voltage
<How to assemble the high voltage generator>
generator
1) Insert the high voltage generator straight into the
2) Pass the leads of the high voltage generator
3) Attach the air ionizer to the back body, and pass
4) Attach the drain guide.
Lue lisää nettisivuiltamme: www.ilmalämpöpumput.com
Procedures
evaporator, and secure it using the fixing screw.
through the area designated and insert them into
its connectors.
the two leads (black) through the area desig-
nated on the electric parts box assembly.
– 87 –
Remarks
Check whether
the leads have
been completely
inserted.
Claw
Claw
Claw

Hide quick links:

Advertisement

loading