GE PV977 Owner's Manual And Installation Instructions page 15

Table of Contents

Advertisement

Available languages

Available languages

CONSTRUCT CEILING SUPPORT (Continued)
• Secure each 2 x 4 block with at least four (4), #10
wood screws, 3" long (not supplied). Use 8 wood
screws total for the two supports.
• The cross framing must be accurately aligned
to assure correct positioning of the hood.
• The cross framing must be level in all directions.
Check with a spirit level and adjust if necessary.
IMPORTANT: The ceiling structure must be capable
of supporting the weight of the hood (approximately
200 pounds) and any inadvertent user contact loads.
The hood support frame will be supported by the
2 x 4 cross framing.
Ductwork for Installations Vented to the Outdoors
• Use the shortest and straightest duct route for
satisfactory performance.
• This vent hood must use 8" round rigid duct.
• Install the house ductwork to run horizontally
between ceiling joists or straight up through
the roof.
Finish the Ceiling
• Finish the ceiling surface. Be sure to mark location
of the ceiling joists and cross framing. Check to be
49-80550-3
Installation Preparation
PREPARE TO INSTALL THE HOOD
2 x 4 min.
Cross framing
Ceiling joist
8"
Duct
2 x 4
Vent straight up
through the ceiling
Ceiling
joist
15

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Pv977

Table of Contents