SECONDARY SHEAVE
:
A
64 Nm (6.4 mSkg, 46 ftSlb)
Order
Job name/Part name
Secondary sheave removal
Left side cover
V-belt
1
Washer and bolt
2
Shim
3
Collar
4
Secondary sheave assembly
5
Shim
SECONDARY SHEAVE
Q'ty
Remove the parts in the order listed below.
Refer to "PRIMARY SHEAVE AND
V-BELT".
1
–
Refer to "SHEAVE OFFSET
ADJUSTMENT" in CHAPTER 2.
1
1
–
For installation, reverse the removal
procedure.
4-10
POWR
TR
Remarks