Bnth Lead/Lag With Indirect; Domestic Hot Water; Connection Terminals; 9.3 Brute System Configurations - Bradford White Brute BNTH1000 Installation And Operation Instructions Manual

Hide thumbs Also See for Brute BNTH1000:
Table of Contents

Advertisement

Page 44
Low demand -
The first burner* in
sequence fires at
less than 65%
First
burner*
Demand increases -
Once the first burner
reaches 50%,
the second burner*
switches on, and
both modulate
together between 29%
and 65%
Demand increases -
Once the first two
burners reach 65%,
the third burner*
switches on, and all
three modulate together
between 29% and 65%
Nearing max. demand -
The fourth burner* is
active. Once all four
reach 65%, all are
allowed to go over
65%
* - The Lead/Lag controller will change the firing order of the
burners, based on the run time of each burner.
Fig. 50 – Lead/Lag Activity in a Multi-Boiler
System
Boiler X
Boiler Y
Third
Fourth
burner*
burner*
9.1.3
NTH Lead/Lag with Indirect

Domestic Hot Water

So far, we have been describing a system which
handles the Central Heat function only. There are
several ways the Domestic Hot Water can be set up
on a Lead/Lag system. For a detailed description,
see Section 9.5.
9.2

Connection Terminals

Figure 51 shows some of the connection terminals
on the circuit board inside the cabinet.
WARNING
Before connecting or disconnecting any wiring
inside a boiler, be absolutely sure to turn off all
electrical power to the unit. Failure to do this
could result in property damage, serious injury or
death.

9.3 Brute System Configurations

Brute's can be installed in many different
arrangements. The steps in the installation will be
different, depending on the number of boilers in
the system, the venting arrangements, the control
signals used, and so on. In this section, we will
list the steps necessary to do the most common
installations.
1.
Table 12 lists most of the common
configurations for Brute systems. Look
through the table until you find a line that
exactly describes your system. Make a
note of the system number shown in the left
column.
2.
Following the table, look up the specific
installation jobs for your system in Section 9.4.
The jobs are identified using letters (Job A
through Job P).
If you are not familiar with the Brute's or the
Lead/Lag control system, you may want to
review the information in Section 9.1. This
may be helpful as you read the installation
instructions which follow.
B
W
RADFORD
HITE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brute bntv1000Brute bnth1200Brute bntv1200

Table of Contents