Mitsubishi Electric FDT125VNVF Technical Manual page 290

Table of Contents

Advertisement

Accessory pipe A
Straight pipe ①
(Procured in the field
above 415mm)
Braze the field pipe here.
Construction example
(Downward)
Accessory pipe A
Straight pipe ①
(Procured in the field
185~235mm)
Elbow procured in the field
Straight pipe ②
(Procured in the field
above 125mm)
Braze the field pipe here.
Construction example
(Rightward)
Construction example
(Forward)
Construction example
(Backward)
289
-
-
'12 • PAC-T-174
Accessory pipe A
Straight pipe ①
(Procured in the field
185~235mm)
Straight pipe ②
(Procured in the field
above 125mm)
Elbow procured in the field
Braze the field pipe here .
Accessory pipe A
Straight pipe ①
(Procured in the field
185~235mm)
Elbow procured in the field
Straight pipe ②
(Procured in the field
above 405mm)
Braze the field pipe here.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents