Samsung DVM Series Service Manual page 70

System air conditioner
Hide thumbs Also See for DVM Series:
Table of Contents

Advertisement

3. Check the status of a test operation through S-NET.
4. Ensure S-NET data after 2 hours over test operation.
Store S-NET data.(Use Alt + Print Screen)
Write an important data on the report.
Judge the test operation compare with the S-NET judge criteria.
Check the error mode of outdoor unit PCB.
Check if there is an error mode on the indoor unit panel and the remote control receiver.
Check if the condensing water of indoor unit is managed properly after 6 hours over test operation.
5. Check the following items additionally after the completion of operation check through S-NET.
Perform the appearance and function test of indoor/outdoor unit.
– Check the remote control and indoor unit swing.
– Perform the appearance test for indoor/outdoor unit.
Stop the system operation by pressing the test operation key after the completion of the test operation.
– Reassemble the cover of outdoor unit, and attach the notice label about the power onto the power panel.
- 69 -
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents