Installation and commissioning

8

Installation

.01
Suitable connections for electricity must be available at the machine's location.
Make sure that a level and firm surface as well as sufficient lighting are guaranteed at the
machine's location.
Connect the ground cable from the sewing head, motor, main switch and additional units
to the frame, see the system service manual.
8

Commissioning

.02
The machine, in particular the electric cables and pneumatic connection tubes must be
checked for damage.
Clean the machine thoroughly and then, with the machine in its assembly position, fill
in oil, see Chapter 10 Care and Maintenance.
When the machine is running, the balance wheel must turn towards the operator. If this
is not the case, have the machine converted by specialized staff.
The machine must only be installed and commissioned by qualified personnel!
It is imperative that all relevant safety regulations are observed!
Installation and commissioning
8 - 1