Rap On Ight Ide - Goodman GMVC950704CX Installation Instructions Manual

Hide thumbs Also See for GMVC950704CX:
Table of Contents

Advertisement

C
D
ONDENSATE
U
I
-T
PRIGHT
NSTALLATIONS
In a upright installation drain hoses are connected to drain ports on
the rubber elbow and the recuperator coil front cover. The drain lines
are then routed through the right side panel and into the drain trap
secured to the outside of the cabinet.
NOTE: Refer to Alternate Vent/Flue Hose Connections for upright
installations using an alternate vent/flue outlet.
1. Remove the rubber plug from the right side of the front cover
drain port.
2. Secure Hose A to front cover drain port with a red hose clamp.
Route hose to rear side panel grommet hole.
3. Cut and remove 1/4 inch from the end of the drain port on the
rubber elbow.
4. Insert Tube 1 into rubber elbow drain port and secure with
silver hose clamp. Angle tube outward toward front of furnace.
L
& D
RAIN
INES
R
S
RAP ON
IGHT
IDE
RED HOSE
FRONT
COVER
CLAMP
DRAIN PORT
Upright "Standard" Connections - Right Side
(Upflow Shown, Counterflow Similar)
T
RAIN
RAP
5. Cut 17 3/4 inches from the long end of Hose B and discard.
Secure the remaining hose to Tube 1 with a green hose
clamp. Route the other end of Hose B to front right side
panel grommet hole.
For details concerning mounting of the drain trap, refer to Horizontal
Drain Trap Mounting.
6. Insert short end of each of tube 2 through side panel grommet
holes. Secure tubes to hoses A and B with green hose
clamps. Ensure hoses and tubes maintain a downward slope
for proper drainage and that they are not kinked or binding.
RIGHT SIDE
HOSE
B
HOSE
GREEN
A
HOSE
CLAMPS
(3 PLACES)
22
PANEL
RUBBER
ELBOW
RUBBER ELBOW
DRAIN PORT
SILVER HOSE CLAMP
TUBE 1
SIDE PANEL
GROMMET
HOLES
TUBE(S) 2
DRAIN
TRAP

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents