Installation Checklist; Manufactured Mobile Home Additional Requirements; Materials Required; Minimum Fireplace Dimensions - Regency Energy U32-NG10 Owners & Installation Manual

Gas insert
Table of Contents

Advertisement

INSTALLATION
CHECKLIST
Before installing vent system ensure that the damper
plate is open and secure to prevent the damper plate
from falling down and crushing the liner.
The Regency Gas Insert is installed as listed.
1) Check all clearances to combustibles, (Refer to
sections "Minimum Fireplace Dimensions and

Clearances to Combustibles)

2) Make the gas connection. (Refer to section
"Gas Connection")
3) Install the 3" flue liner to the sliding connector
plate. (Refer to section "Flue Liner Installation.")
4) Slide the unit half way into the fireplace.
5) Pull the vent connector plate through the tapered
brackets and fasten to the front plate. Refer to
section "Flue Liner Installation.")
6) Slide the unit fully into the fireplace.
7) Install 4AA batteries into receiver. Hook receiver
to wire marked receiver, this will enable
operation of the appliance manually when
position in "ON" position.
8) Test gas pressure (Refer to section "Gas Pipe
Pressure Testing"). Check aeration system
(Refer to section "Gas Insert Aeration System").
9) Install standard and optional features. Refer
to the following sections:
a. Brick Panel
b. Log Set
c. Low Profile Faceplate
d. Standard Flush Door
e. Remote Control
10) Final check: Before leaving this unit with the
customer, the installer must ensure that the
appliance is firing correctly. This includes:
a) Clocking the appliance to ensure the correct
firing rate.
b) Adjusting the primary air, if required, to
ensure that the flame does not carbon. See
"Gas Insert Aeration System" section.
c) Ensuring that the appliance is venting
correctly.
MANUFACTURED
MOBILE HOME
ADDITIONAL
REQUIREMENTS
1) Ensure that structural members are not cut or
weakened during installation.
2) Ensure proper grounding using the #8 ground
lug provided.
3) Appliance must be anchored to the floor with
the supplied anchoring methods.

MATERIALS REQUIRED

No electrical power supply is required for the gas
control to operate. A 120 Volt AC power cord is
hooked up to the fan. Plug the 3 wire cord into a
suitable receptacle. Do not cut the ground terminal
off under any circumstances. When connected
with 120 volts, the appliance must be electrically
grounded in accordance with local codes, current
version of CSA C22.1 (in Canada) or in the absence
of local codes, with the National Electrical Code
ANSI/NFPA 70-1987.
MINIMUM FIREPLACE
DIMENSIONS
The minimum fireplace clearances & dimensions for
the Regency gas insert are shown in the following
diagrams:
A
B
C
D
E
Max Lentil
Bar Depth
Height
Depth
A
B
C
Low
8-1/8"
22"
14"
Profile
Faceplate
w/Spacer
Low
9-3/4"
22"
15-5/8"
Profile
Faceplate
installation
CLEARANCES TO
COMBUSTIBLES
Minimum Clearances to Combustibles
Sides
Ceiling
Mantel
Max. Mantle Depth
Min. Alcove Width
Max. Alcove Depth
*No Hearth Required
Combustible Mantel Clearances in
Masonry and Factory Built
Fireplace Installations
Mantle
Faceplate
Width
Width
(rear)
(front)
D
E
22-1/2"
26-1/2"
22-1/2"
29-3/4"
U32-10 Regency
|
9
From Unit
A
10" / 255 mm
B
47.5" / 1205 mm
C
see Dia. 2 & 3
G
12" / 305 mm
(see Dia. 2)
K
48" / 1220 mm
L
36" / 915 mm
Diagram 1
12" Max.
G
C
Combustible
Flooring
Flush
with
Floor
Diagram 2
|
Direct Vent Gas Insert
®
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Energy u32-lp10Energy u32

Table of Contents