Commissioning / Setting The Bus Address - Wolf CGB-75 Assembly And Operating Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

Only qualified personnel must carry out the
commissioning and initial start-up of the boiler
as well as instruct the user.
- Check the boiler and system for leaks;
NB
Normal operating pressure when system is cold
1.5 - 2.0 bar; prevent water leaks
- Check location and seating of fitted parts
- Check all connections and component unions
for leaks
- If tightness cannot be ensured then there is
a risk of water damage
- Check the correct assembly of the flue gas accessories
- Open the feed and return shut-off valves
- Open the gas shut-off valve
- Turn the operating switch of the controller on
- Check the over-ignition and regularity of the flame of the
main burner
- If the wall-mounted boiler goes properly into operation, the
illuminated ring for the status indication lights up yellow
- Check the condensate drain
- Familiarise customers with the operation of the appliance
using the operating manual and refer to possibly necessary
water treatment for the filling and supplementary water
- Complete the commissioning protocol and hand over the
manuals to the customer
BUS address setting:
When operating several boilers (number of boilers >1) in conjunction with a cascade module, set the BUS address of each boiler
in accordance with the table below.
Hold down the reset button; after 5 seconds, the corresponding flashing code will be displayed (see table). Select the corresponding
address with the DHW temperature rotary selector; then release the reset button again.
Boiler
BUS address
Single boiler
0
Boiler cascade
Boiler 1
1
Boiler 2
2
Boiler 3
3
Boiler 4
4
Boiler 4
5
3062555_201507
Commissioning /
BUS address adjustment
Figure: Control unit overview
Saving energy
- Instruct the customer about energy saving options.
- Refer your customer to section "Information regarding
energy efficient operation" in the operating instructions.
Rotary selector position
DHW
6
1
2
3
4
5
ON/OFF
Reset button
switch
Illuminated signal ring
Illuminated signal ring indication
flashing green (factory setting)
flashing red
flashing yellow
flashing yellow/red
flashing yellow/green
green/flashing red
Thermometer
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-100

Table of Contents