Installation - Wolf CGB-75 Assembly And Operating Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

Opening the casing cover
We recommend you remove the casing cover during the

installation.

Release the casing cover with the l.h. and r.h. screw. Release
the bottom of the casing cover and unhook at the top.
Seal the front casing tightly with screws after
completing the service. There is a risk of carbon
monoxide poisoning if the flue system is faulty.
Mounting the boiler with a mounting bracket
During installation of the gas condensing boiler,
ensure that all fixings are strong enough to carry
its weight. Also consider the wall consistency,
otherwise gas or water may escape which could
lead to explosions and flooding.
Initially, determine the location for the installation of the gas
condensing boiler.
In your deliberations, consider the flue gas outlet, the lateral
clearances towards walls and ceilings and any existing
connections for gas, central heating, DHW and electrics.
- Mark the holes to be drilled for the mounting bracket, taking
into consideration the minimum clearances.
- Insert the rawl plugs and fit the mounting bracket with the
coach bolts and washers supplied.
- Hang the gas condensing boiler with the mounting stays into
the mounting bracket.
3062555_201507
Installation
Figure: Undoing screws
Figure: Fixing holes for mounting bracket
Figure: Mounting brace on the condensing boiler
Screws
Ceiling
Mounting stays
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-100

Table of Contents