HP 5920 Series Configuration Manual page 178

Hide thumbs Also See for 5920 Series:
Table of Contents

Advertisement

Figure 75 Network diagram
 
Configuration procedure
Make sure Switch A and Switch B have the corresponding VLAN interfaces created and can reach each
other through IPv4.
Configure Switch A:
# Configure an IPv4 address for VLAN-interface 100.
<SwitchA> system-view
[SwitchA] interface vlan-interface 100
[SwitchA-Vlan-interface100] ip address 10.1.1.1 255.255.255.0
[SwitchA-Vlan-interface100] quit
# Configure an IPv4 address for VLAN-interface 101 (physical interface of the tunnel).
[SwitchA] interface vlan-interface 101
[SwitchA-Vlan-interface101] ip address 2.1.1.1 255.255.255.0
[SwitchA-Vlan-interface101] quit
# Create service loopback group 1 and specify its service type as tunnel.
[SwitchA] service-loopback group 1 type tunnel
# Assign Ten-GigabitEthernet 1/0/3 to service loopback group 1.
[SwitchA] interface Ten-GigabitEthernet 1/0/3
[SwitchA-Ten-GigabitEthernet1/0/3] port service-loopback group 1
[SwitchA-Ten-GigabitEthernet1/0/3] quit
# Create an IPv4 over IPv4 tunnel interface tunnel 1.
[SwitchA] interface tunnel 1 mode ipv4-ipv4
# Configure an IPv4 address for the tunnel interface.
[SwitchA-Tunnel1] ip address 10.1.2.1 255.255.255.0
# Configure the source address for the tunnel interface (IP address of VLAN-interface 101).
[SwitchA-Tunnel1] source 2.1.1.1
# Configure the destination address for the tunnel interface (IP address of VLAN-interface 101 of
Switch B).
[SwitchA-Tunnel1] destination 3.1.1.1
[SwitchA-Tunnel1] quit
# Configure a static route destined for the IP network Group 2 through the tunnel interface.
[SwitchA] ip route-static 10.1.3.0 255.255.255.0 tunnel 1
Configure Switch B:
# Configure an IPv4 address for VLAN-interface 100.
<SwitchB> system-view
[SwitchB] interface vlan-interface 100
169

Advertisement

Table of Contents
loading

This manual is also suitable for:

5900 series

Table of Contents