To adjust the circulator blower speed, proceed as follows:
1. Turn OFF power to the furnace.
2. Select the heating and cooling blower speeds that match
the installation requirements from the airflow table in the
Specification Sheet.
3. Relocate desired motor leads to the circulator blower heat
and cool speed terminals on the integrated control module.
(Terminals are identified as HEAT and COOL (hot)). If heating
and cooling blower speeds are the same, a jumper wire
must be used between the heat and cool terminals.
4. Connect all unused blower motor leads to the "PARK"
terminals on the integrated control module. Any leads not
connected to the "PARK" terminals must be taped.
5. Turn ON power to furnace.
6. Verify proper temperature rise as outlined in Section XIV,
Startup Procedure and Adjustment - Temperature Rise.
Circulator Blower Speeds
Low
Medium Low
Medium
High
Common/Neutral
XV. NORMAL SEQUENCE OF OPERATION
P
U
OWER
P
The normal power up sequence is as follows:
115 VAC power applied to furnace.
Integrated control module performs internal checks.
Integrated control module LED will light.
Integrated control module monitors safety circuits
continuously.
Furnace awaits call from thermostat.
H
M
EATING
ODE
The normal operational sequence in heating mode is as follows:
R and W thermostat contacts close, initiating a call for heat.
Integrated control module performs safety circuit checks.
Induced draft blower is energized for 15 second prepurge
period causing pressure switch contacts to close.
Igniter warm up begins after 15 second prepurge expires.
Gas valve opens at end of igniter warm up period, delivering
gas to burners and establishing flame.
Integrated control module monitors flame presence. Gas
valve will remain open only if flame is sensed.
Circulator blower is energized on heat speed following a fixed
thirty second blower on delay.
Furnace runs, integrated control module monitors safety circuits
continuously.
R and W thermostat contacts open, completing the call for
heat.
Red
Orange
Blue
Black
White
31
Gas valve closes, extinguishing flame.
Induced draft blower is de-energized following a fifteen second
post purge.
Circulator blower is de-energized following the heat off delay
period (fixed 150 seconds).
Furnace awaits next call from thermostat.
C
M
OOLING
ODE
The normal operational sequence in cooling mode is as follows:
R and Y thermostat contacts close, initiating a call for cool.
Integrated control module performs safety circuit checks.
Outdoor fan and compressor are energized.
Circulator blower is energized on cool speed following a
fixed five second on delay.
Furnace circulator blower and outdoor cooling unit run,
integrated control module monitors safety circuits
continuously.
R and Y thermostat contacts open, completing the call for
cool.
Outdoor fan and compressor are de-energized.
Circulator blower is de-energized following a fixed forty five
second cool off delay period.
Furnace awaits next call from thermostat.
F
O
M
AN
NLY
ODE
The normal operational sequence in fan only mode is as follows:
R and G thermostat contacts close, initiating a call for fan.
Integrated control module performs safety circuit checks.
Circulator blower is energized on heat speed.
Circulator blower runs, integrated control module monitors
safety circuits continuously.
R and G thermostat contacts open, completing the call for
fan.
Circulator blower is de-energized.
Furnace awaits next call from thermostat.
XVI. OPERATIONAL CHECKS
B
F
URNER
LAME
The burner flames should be inspected with the burner compart-
ment door installed. A sight glass is provided for inspection pur-
poses. Flames should stable, quiet, soft, and blue (dust may
cause orange tips but they must not be yellow). Flames should
extend directly outward from the burners without curling, floating, or
lifting off. Flames must not impinge on the sides of the heat ex-
changer firing tubes.