Outdoor Unit (Ras-10Uax-T2) - Toshiba RAS-13UKPX-T2 Service Manual

Split wall type
Table of Contents

Advertisement

10-3. Outdoor Unit (RAS-10UAX-T2)

No.
Part name
1
Common
procedure
2
Capacitor for
compressor
3
Capacitor for
fan motor
4
Overload relay
Procedures
1) Stop the operation of air-conditioner, and
disconnect the power cord from the AC
supply.
2) Remove Electric parts cover.
(2-Screws ∅4 x 10L)
3) Remove the cord clamp (2-Screws ∅4 x 22L)
and disconnect the connecting cable.
4) Remove the front cabinet.
(7-Screws ∅4 x 10L with nylon washer)
Pull the front lower portion toward you, and
remove it pulling out upward.
1) Perform the common procedure 1.
2) Remove the fixing screw and the capacitor
band.
(1-Screw ∅4 x 8L)
3) Disconnect the lead wires.
1) Perform the common procedure 1.
2) Remove the fixing screw.
3) Disconnect the lead wires.
1) Perform the common procedure 1.
2) Remove the terminal cover of compressor.
3) Remove the overload relay holder and pull
up the overload relay.
4) Disconnect the lead wires.
– 62 –
FILE NO. SVM-02003
Remarks
Remove
7-Screws ∅4 x 10L
2-Screws ∅4 x 10L
2-Screws ∅4 x 22L
For fan motor
For compressor
Overload relay

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents